Developer, Giarratana, LLC, is constructing a new, luxury multi-family high-rise. The tower will stand 34 stories and 416 feet tall and consist of 356 residences. The Alcove is the first building set to be completed as a part of the Church Street Development, and will soon be joined by the 801 Church and 1010 Church projects, as a part of the grand visual and architectural gateway to Nashville's downtown.
The 377,000 GSF building is designed to have 356 units, served from a ground floor lobby that provides rooftop amenities to the residents including private dining spaces, outdoor rooftop decks, 2 pools and a rooftop game room. The building includes retail, parking and BOH support spaces to complete the project’s design.
The Bala Technology design team provided technology design services encompassing all facets of tenant experience and operator management of the building including carrier/service provider coordination, resilient riser design, Smarthome, touchless access controls, package delivery, amenity audiovisual systems and identifying relevant systems integrations to unify the tenant technology packages.