Aloft Hotel

Philadelphia, PA
Expertise
Mechanical
Electrical
Plumbing
Fire Protection
Size
181,000 SF

First constructed in 1925 as the headquarters for the bank, Liberty Title and Trust Company, this 21-story, historic building was acquired by Marriott and completely renovated to create a new comfortable hotel that mixes the old with the new.  Bala was chosen to perform the full mechanical, electrical, plumbing and fire protection design services for this adaptive-reuse project. 

Having been abandoned for many years, this adaptive-reuse of the 120,000 SF building located at 101 North Broad Street required all new mechanical, electrical, plumbing and fire protection (MEP/FP) systems.
Bala’s project team provided the design services for the renovation, which included amenities such as dining, a fitness center and lounge.  

Bala designed a new water source heat pump (WSHP) system to provide condenser water to vertically stacked heat pumps in each room.  There is also a central domestic, high-efficiency hot water system that services the entire hotel and the building was retro-fitted with a new 13.2 high tension electrical service and new emergency generator.  

Fast Facts:
Historic
Gym